| 
The spa will need a full 13amp weatherproof socket for the 6-metre-long cable to plug into.
  Below are the steps when setting it up;
 - Make sure it will be on a flat and level surface.
 - Clear the area for the spa 190cm + 50cm for the PCU unit which includes the pipes.
 - Inflate the lid first until it's in its shape.
 - Next up inflate the main bladder until it's to the shape with a little bit of give, the hot water will cause the bladder to get to its true size, and will take 1-2 weeks for this expansion. 
 - Keep the inlet and outlet caps (KK-10163) fitted on the inside.
 - Make sure there is a filter inside the filter housing of the PCU.
 - Fill the spa up with hose-temperature water only to just above the orange wavey lines on the inside.
 - Connect your pipes for the heat, filtration, and jets, and make sure that they are straight with no kinks.
 - Remove the caps (KK-10163), let the water flood the PCU system, and then with the star valve on the filter housing lid, turn anticlockwise and purge for 10-20 seconds until all the air escapes and all that is left is just water escaping, then tighten up.
 - Set your spa water temperature and then press heat.
 
  |  
  |  
   |  Input your own serial number similar to the above into the warranty registration.
   click button below; |  
  |  
  | 
 | 
Article published by Ali Green